BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//MBTA Shutdown Calendar//transitmatters.org//
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Copley - Heath Street
DTSTART;VALUE=DATE:20231127
DTEND;VALUE=DATE:20231206
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Copley and Heath
  Street.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Green Line Shutdown | Copley - Heath Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - Babcock Street
DTSTART;VALUE=DATE:20231127
DTEND;VALUE=DATE:20231206
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Babc
 ock Street.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Green Line Shutdown | Kenmore - Babcock Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | North Station - Kenmore
DTSTART;VALUE=DATE:20231127
DTEND;VALUE=DATE:20231206
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between North Station an
 d Kenmore.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Green Line Shutdown | North Station - Kenmore
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Riverside - Kenmore
DTSTART;VALUE=DATE:20231211
DTEND;VALUE=DATE:20231221
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Riverside and Ke
 nmore.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Green Line Shutdown | Riverside - Kenmore
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Copley - Heath Street
DTSTART;VALUE=DATE:20240103
DTEND;VALUE=DATE:20240113
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Copley and Heath
  Street.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-announc
 es-ambitious-track-improvement-program-eliminate-all-speed-restrictions
NAME:MBTA Green Line Shutdown | Copley - Heath Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - Babcock Street
DTSTART;VALUE=DATE:20240103
DTEND;VALUE=DATE:20240113
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Babc
 ock Street.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-anno
 unces-ambitious-track-improvement-program-eliminate-all-speed-restrictions
NAME:MBTA Green Line Shutdown | Kenmore - Babcock Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | North Station - Kenmore
DTSTART;VALUE=DATE:20240103
DTEND;VALUE=DATE:20240113
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between North Station an
 d Kenmore.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-annou
 nces-ambitious-track-improvement-program-eliminate-all-speed-restrictions
NAME:MBTA Green Line Shutdown | North Station - Kenmore
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Copley - Heath Street
DTSTART;VALUE=DATE:20240116
DTEND;VALUE=DATE:20240129
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Copley and Heath
  Street.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-announc
 es-ambitious-track-improvement-program-eliminate-all-speed-restrictions
NAME:MBTA Green Line Shutdown | Copley - Heath Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - Babcock Street
DTSTART;VALUE=DATE:20240116
DTEND;VALUE=DATE:20240129
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Babc
 ock Street.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-anno
 unces-ambitious-track-improvement-program-eliminate-all-speed-restrictions
NAME:MBTA Green Line Shutdown | Kenmore - Babcock Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | North Station - Kenmore
DTSTART;VALUE=DATE:20240116
DTEND;VALUE=DATE:20240129
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between North Station an
 d Kenmore.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-annou
 nces-ambitious-track-improvement-program-eliminate-all-speed-restrictions
NAME:MBTA Green Line Shutdown | North Station - Kenmore
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | North Station - Medford/Tufts
DTSTART;VALUE=DATE:20240120
DTEND;VALUE=DATE:20240122
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between North Station an
 d Medford/Tufts.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta
 -announces-ambitious-track-improvement-program-eliminate-all-speed-restric
 tions
NAME:MBTA Green Line Shutdown | North Station - Medford/Tufts
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Copley - Babcock Street
DTSTART;VALUE=DATE:20240220
DTEND;VALUE=DATE:20240309
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Copley and Babco
 ck Street.\n\nRead more at https://www.mbta.com/news/2024-02-23/march-serv
 ice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Green Line Shutdown | Copley - Babcock Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Copley - Brookline Hills
DTSTART;VALUE=DATE:20240220
DTEND;VALUE=DATE:20240309
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Copley and Brook
 line Hills.\n\nRead more at https://www.mbta.com/news/2024-02-23/march-ser
 vice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Green Line Shutdown | Copley - Brookline Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Copley - Cleveland Circle
DTSTART;VALUE=DATE:20240220
DTEND;VALUE=DATE:20240309
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Copley and Cleve
 land Circle.\n\nRead more at https://www.mbta.com/news/2024-02-23/march-se
 rvice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Green Line Shutdown | Copley - Cleveland Circle
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | North Station - Medford/Tufts
DTSTART;VALUE=DATE:20240713
DTEND;VALUE=DATE:20240715
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between North Station an
 d Medford/Tufts.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta
 -announces-ambitious-track-improvement-program-eliminate-all-speed-restric
 tions
NAME:MBTA Green Line Shutdown | North Station - Medford/Tufts
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Boston College - Babcock Street
DTSTART;VALUE=DATE:20240802
DTEND;VALUE=DATE:20240812
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Boston College a
 nd Babcock Street.\n\nRead more at https://www.mbta.com/news/2024-07-17/au
 gust-service-changes-mbta-continues-repair-work-improve-reliability-across
 -the
NAME:MBTA Green Line Shutdown | Boston College - Babcock Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Newton Highlands - Kenmore
DTSTART;VALUE=DATE:20241005
DTEND;VALUE=DATE:20241007
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Newton Highlands
  and Kenmore.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-an
 nounces-ambitious-track-improvement-program-eliminate-all-speed-restrictio
 ns
NAME:MBTA Green Line Shutdown | Newton Highlands - Kenmore
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Riverside - Brookline Hills
DTSTART;VALUE=DATE:20241019
DTEND;VALUE=DATE:20241021
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Riverside and Br
 ookline Hills.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-a
 nnounces-ambitious-track-improvement-program-eliminate-all-speed-restricti
 ons
NAME:MBTA Green Line Shutdown | Riverside - Brookline Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Riverside - Kenmore
DTSTART;VALUE=DATE:20241109
DTEND;VALUE=DATE:20241111
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Riverside and Ke
 nmore.\n\nRead more at https://www.mbta.com/news/2024-10-17/november-servi
 ce-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Green Line Shutdown | Riverside - Kenmore
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Union Square - Lechmere
DTSTART;VALUE=DATE:20241111
DTEND;VALUE=DATE:20241118
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Union Square and
  Lechmere.\n\nRead more at https://www.mbta.com/news/2024-10-17/november-s
 ervice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Green Line Shutdown | Union Square - Lechmere
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Union Square - Park Street
DTSTART;VALUE=DATE:20241116
DTEND;VALUE=DATE:20241118
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Union Square and
  Park Street.\n\nRead more at https://www.mbta.com/news/2024-10-17/novembe
 r-service-changes-mbta-continues-repair-work-improve-reliability-across-th
 e
NAME:MBTA Green Line Shutdown | Union Square - Park Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Medford/Tufts - Park Street
DTSTART;VALUE=DATE:20241206
DTEND;VALUE=DATE:20241221
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Medford/Tufts an
 d Park Street.\n\nRead more at https://www.mbta.com/news/2024-11-15/decemb
 er-service-changes-mbta-continues-repair-work-improve-reliability-across-t
 he
NAME:MBTA Green Line Shutdown | Medford/Tufts - Park Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Union Square - Park Street
DTSTART;VALUE=DATE:20241206
DTEND;VALUE=DATE:20241221
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Union Square and
  Park Street.\n\nRead more at https://www.mbta.com/news/2024-11-15/decembe
 r-service-changes-mbta-continues-repair-work-improve-reliability-across-th
 e
NAME:MBTA Green Line Shutdown | Union Square - Park Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | North Station - Babcock Street
DTSTART;VALUE=DATE:20250222
DTEND;VALUE=DATE:20250224
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between North Station an
 d Babcock Street.\n\nReason: Regular maintenance\n\nRead more at https://w
 ww.mbta.com/news/2025-01-22/mbta-announces-february-service-changes
NAME:MBTA Green Line Shutdown | North Station - Babcock Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | North Station - Heath Street
DTSTART;VALUE=DATE:20250222
DTEND;VALUE=DATE:20250224
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between North Station an
 d Heath Street.\n\nReason: Regular maintenance\n\nRead more at https://www
 .mbta.com/news/2025-01-22/mbta-announces-february-service-changes
NAME:MBTA Green Line Shutdown | North Station - Heath Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | North Station - Kenmore
DTSTART;VALUE=DATE:20250222
DTEND;VALUE=DATE:20250224
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between North Station an
 d Kenmore.\n\nReason: Regular maintenance\n\nRead more at https://www.mbta
 .com/news/2025-01-22/mbta-announces-february-service-changes
NAME:MBTA Green Line Shutdown | North Station - Kenmore
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Boston College - South Street
DTSTART;VALUE=DATE:20250411
DTEND;VALUE=DATE:20250414
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Boston College a
 nd South Street.\n\nRead more at https://www.mbta.com/projects/2025-planne
 d-closures
NAME:MBTA Green Line Shutdown | Boston College - South Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Medford/Tufts - Government Center
DTSTART;VALUE=DATE:20250426
DTEND;VALUE=DATE:20250428
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Medford/Tufts an
 d Government Center.\n\nRead more at https://www.mbta.com/projects/2025-pl
 anned-closures
NAME:MBTA Green Line Shutdown | Medford/Tufts - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Park Street - Government Center
DTSTART;VALUE=DATE:20250426
DTEND;VALUE=DATE:20250428
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Park Street and 
 Government Center.\n\nRead more at https://www.mbta.com/projects/2025-plan
 ned-closures
NAME:MBTA Green Line Shutdown | Park Street - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Union Square - Government Center
DTSTART;VALUE=DATE:20250426
DTEND;VALUE=DATE:20250428
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Union Square and
  Government Center.\n\nRead more at https://www.mbta.com/projects/2025-pla
 nned-closures
NAME:MBTA Green Line Shutdown | Union Square - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Boston College - South Street
DTSTART;VALUE=DATE:20250502
DTEND;VALUE=DATE:20250505
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Boston College a
 nd South Street.\n\nRead more at https://www.mbta.com/projects/2025-planne
 d-closures
NAME:MBTA Green Line Shutdown | Boston College - South Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Babcock Street - Government Center
DTSTART;VALUE=DATE:20250604
DTEND;VALUE=DATE:20250609
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Babcock Street a
 nd Government Center.\n\nRead more at https://www.mbta.com/projects/2025-p
 lanned-closures
NAME:MBTA Green Line Shutdown | Babcock Street - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Heath Street - North Station
DTSTART;VALUE=DATE:20250604
DTEND;VALUE=DATE:20250609
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Heath Street and
  North Station.\n\nRead more at https://www.mbta.com/projects/2025-planned
 -closures
NAME:MBTA Green Line Shutdown | Heath Street - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - Government Center
DTSTART;VALUE=DATE:20250604
DTEND;VALUE=DATE:20250609
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Gove
 rnment Center.\n\nRead more at https://www.mbta.com/projects/2025-planned-
 closures
NAME:MBTA Green Line Shutdown | Kenmore - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - North Station
DTSTART;VALUE=DATE:20250604
DTEND;VALUE=DATE:20250609
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Nort
 h Station.\n\nRead more at https://www.mbta.com/projects/2025-planned-clos
 ures
NAME:MBTA Green Line Shutdown | Kenmore - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - Riverside
DTSTART;VALUE=DATE:20250903
DTEND;VALUE=DATE:20250912
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Rive
 rside.\n\nReason: During this shutdown\, the T will install Green Line Tra
 in Protection System infrastructure and perform regular maintenance work\,
  ensuring track is up to up to the T’s state-of-good-repair standards.\n
 \nRead more at https://www.mbta.com/projects/2025-planned-closures
NAME:MBTA Green Line Shutdown | Kenmore - Riverside
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Medford/Tufts - North Station
DTSTART;VALUE=DATE:20251003
DTEND;VALUE=DATE:20251006
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Medford/Tufts an
 d North Station.\n\nReason: During this shutdown\, the T will install Gree
 n Line Train Protection System infrastructure and perform regular maintena
 nce work\, ensuring track is up to up to the T’s state-of-good-repair st
 andards.\n\nRead more at https://www.mbta.com/projects/2025-planned-closur
 es
NAME:MBTA Green Line Shutdown | Medford/Tufts - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Union Square - North Station
DTSTART;VALUE=DATE:20251003
DTEND;VALUE=DATE:20251006
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Union Square and
  North Station.\n\nReason: During this shutdown\, the T will install Green
  Line Train Protection System infrastructure and perform regular maintenan
 ce work\, ensuring track is up to up to the T’s state-of-good-repair sta
 ndards.\n\nRead more at https://www.mbta.com/projects/2025-planned-closure
 s
NAME:MBTA Green Line Shutdown | Union Square - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - Riverside
DTSTART;VALUE=DATE:20251024
DTEND;VALUE=DATE:20251101
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Rive
 rside.\n\nReason: During this shutdown\, the T will install Green Line Tra
 in Protection System infrastructure and perform regular maintenance work\,
  ensuring track is up to up to the T’s state-of-good-repair standards.\n
 \nRead more at https://www.mbta.com/projects/2025-planned-closures
NAME:MBTA Green Line Shutdown | Kenmore - Riverside
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - Government Center
DTSTART;VALUE=DATE:20251104
DTEND;VALUE=DATE:20251114
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Gove
 rnment Center.\n\nReason: GLTPS installation\nGL-D: Take 109 to Sullivan o
 r Harvard\nGL-E: Shuttle buses from Medford/Tufts to North Station\, trans
 fer between Green Line at Park Street and Orange Line at DTX via Winter St
 reet Concourse for service to and from North Station\n\nRead more at https
 ://www.mbta.com/news/2025-10-20/mbta-announces-november-service-changes
NAME:MBTA Green Line Shutdown | Kenmore - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Medford/Tufts - Park Street
DTSTART;VALUE=DATE:20251104
DTEND;VALUE=DATE:20251114
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Medford/Tufts an
 d Park Street.\n\nReason: GLTPS installation\nGL-D: Take 109 to Sullivan o
 r Harvard\nGL-E: Shuttle buses from Medford/Tufts to North Station\, trans
 fer between Green Line at Park Street and Orange Line at DTX via Winter St
 reet Concourse for service to and from North Station\n\nRead more at https
 ://www.mbta.com/news/2025-10-20/mbta-announces-november-service-changes
NAME:MBTA Green Line Shutdown | Medford/Tufts - Park Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Park Street - Government Center
DTSTART;VALUE=DATE:20251104
DTEND;VALUE=DATE:20251114
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Park Street and 
 Government Center.\n\nReason: GLTPS installation\nGL-D: Take 109 to Sulliv
 an or Harvard\nGL-E: Shuttle buses from Medford/Tufts to North Station\, t
 ransfer between Green Line at Park Street and Orange Line at DTX via Winte
 r Street Concourse for service to and from North Station\n\nRead more at h
 ttps://www.mbta.com/news/2025-10-20/mbta-announces-november-service-change
 s
NAME:MBTA Green Line Shutdown | Park Street - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Union Square - Park Street
DTSTART;VALUE=DATE:20251104
DTEND;VALUE=DATE:20251114
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Union Square and
  Park Street.\n\nReason: GLTPS installation\nGL-D: Take 109 to Sullivan or
  Harvard\nGL-E: Shuttle buses from Medford/Tufts to North Station\, transf
 er between Green Line at Park Street and Orange Line at DTX via Winter Str
 eet Concourse for service to and from North Station\n\nRead more at https:
 //www.mbta.com/news/2025-10-20/mbta-announces-november-service-changes
NAME:MBTA Green Line Shutdown | Union Square - Park Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Copley - North Station
DTSTART;VALUE=DATE:20251208
DTEND;VALUE=DATE:20251222
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Copley and North
  Station.\n\nRead more at https://www.mbta.com/projects/2025-planned-closu
 res
NAME:MBTA Green Line Shutdown | Copley - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Babcock Street - Government Center
DTSTART;VALUE=DATE:20251208
DTEND;VALUE=DATE:20251223
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Babcock Street a
 nd Government Center.\n\nRead more at https://www.mbta.com/projects/2025-p
 lanned-closures
NAME:MBTA Green Line Shutdown | Babcock Street - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Heath Street - North Station
DTSTART;VALUE=DATE:20251208
DTEND;VALUE=DATE:20251223
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Heath Street and
  North Station.\n\nRead more at https://www.mbta.com/projects/2025-planned
 -closures
NAME:MBTA Green Line Shutdown | Heath Street - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - Government Center
DTSTART;VALUE=DATE:20251208
DTEND;VALUE=DATE:20251223
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Gove
 rnment Center.\n\nRead more at https://www.mbta.com/projects/2025-planned-
 closures
NAME:MBTA Green Line Shutdown | Kenmore - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Green Line Shutdown | Kenmore - North Station
DTSTART;VALUE=DATE:20251208
DTEND;VALUE=DATE:20251223
COLOR:green
DESCRIPTION:The MBTA Green Line will be shut down between Kenmore and Nort
 h Station.\n\nRead more at https://www.mbta.com/projects/2025-planned-clos
 ures
NAME:MBTA Green Line Shutdown | Kenmore - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Alewife - Harvard
DTSTART;VALUE=DATE:20240205
DTEND;VALUE=DATE:20240215
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Alewife and Harvar
 d.\n\nRead more at https://www.mbta.com/news/2024-01-19/february-service-c
 hanges-update-mbta-continue-repair-work-improve-and-deliver-more
NAME:MBTA Red Line Shutdown | Alewife - Harvard
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Harvard - Broadway
DTSTART;VALUE=DATE:20240224
DTEND;VALUE=DATE:20240226
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Harvard and Broadw
 ay.\n\nRead more at https://www.mbta.com/news/2024-01-19/february-service-
 changes-update-mbta-continue-repair-work-improve-and-deliver-more
NAME:MBTA Red Line Shutdown | Harvard - Broadway
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Park Street - JFK/UMass (Ashmont)
DTSTART;VALUE=DATE:20240302
DTEND;VALUE=DATE:20240304
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Park Street and JF
 K/UMass (Ashmont).\n\nRead more at https://www.mbta.com/news/2024-02-23/ma
 rch-service-changes-mbta-continues-repair-work-improve-reliability-across-
 the
NAME:MBTA Red Line Shutdown | Park Street - JFK/UMass (Ashmont)
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - Ashmont
DTSTART;VALUE=DATE:20240330
DTEND;VALUE=DATE:20240401
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and Ashmo
 nt.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-service-cha
 nges-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Red Line Shutdown | Broadway - Ashmont
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - North Quincy
DTSTART;VALUE=DATE:20240330
DTEND;VALUE=DATE:20240401
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and North
  Quincy.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-servic
 e-changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Red Line Shutdown | Broadway - North Quincy
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - Ashmont
DTSTART;VALUE=DATE:20240406
DTEND;VALUE=DATE:20240408
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and Ashmo
 nt.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-service-cha
 nges-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Red Line Shutdown | Broadway - Ashmont
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - North Quincy
DTSTART;VALUE=DATE:20240406
DTEND;VALUE=DATE:20240408
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and North
  Quincy.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-servic
 e-changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Red Line Shutdown | Broadway - North Quincy
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Park Street - JFK/UMass (Ashmont)
DTSTART;VALUE=DATE:20240502
DTEND;VALUE=DATE:20240511
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Park Street and JF
 K/UMass (Ashmont).\n\nRead more at https://www.mbta.com/news/2024-04-22/ma
 y-service-changes-mbta-continues-work-improve-reliability-across-the-syste
 m
NAME:MBTA Red Line Shutdown | Park Street - JFK/UMass (Ashmont)
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - Braintree
DTSTART;VALUE=DATE:20240511
DTEND;VALUE=DATE:20240513
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and Brain
 tree.\n\nRead more at https://www.mbta.com/news/2024-04-22/may-service-cha
 nges-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Red Line Shutdown | Broadway - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - Braintree
DTSTART;VALUE=DATE:20240518
DTEND;VALUE=DATE:20240520
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and Brain
 tree.\n\nRead more at https://www.mbta.com/news/2024-04-22/may-service-cha
 nges-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Red Line Shutdown | Broadway - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Alewife - Harvard
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240603
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Alewife and Harvar
 d.\n\nRead more at https://www.mbta.com/news/2024-05-20/june-service-chang
 es-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Alewife - Harvard
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - Braintree
DTSTART;VALUE=DATE:20240608
DTEND;VALUE=DATE:20240610
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and Brain
 tree.\n\nRead more at https://www.mbta.com/news/2024-05-20/june-service-ch
 anges-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Broadway - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - Braintree
DTSTART;VALUE=DATE:20240615
DTEND;VALUE=DATE:20240617
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and Brain
 tree.\n\nRead more at https://www.mbta.com/news/2024-05-20/june-service-ch
 anges-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Broadway - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Alewife - Harvard
DTSTART;VALUE=DATE:20240629
DTEND;VALUE=DATE:20240701
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Alewife and Harvar
 d.\n\nRead more at https://www.mbta.com/news/2024-05-20/june-service-chang
 es-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Alewife - Harvard
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Alewife - Kendall/MIT
DTSTART;VALUE=DATE:20240712
DTEND;VALUE=DATE:20240729
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Alewife and Kendal
 l/MIT.\n\nRead more at https://www.mbta.com/news/2024-06-18/july-service-c
 hanges-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Alewife - Kendall/MIT
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Ashmont)
DTSTART;VALUE=DATE:20240713
DTEND;VALUE=DATE:20240715
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Kendall/MIT and JF
 K/UMass (Ashmont).\n\nRead more at https://www.mbta.com/news/2024-06-18/ju
 ly-service-changes-mbta-continues-repair-work-improve-reliability-across-t
 he
NAME:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Ashmont)
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Kendall/MIT - Park Street
DTSTART;VALUE=DATE:20240720
DTEND;VALUE=DATE:20240722
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Kendall/MIT and Pa
 rk Street.\n\nRead more at https://www.mbta.com/news/2024-06-18/july-servi
 ce-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Kendall/MIT - Park Street
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Ashmont)
DTSTART;VALUE=DATE:20240727
DTEND;VALUE=DATE:20240729
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Kendall/MIT and JF
 K/UMass (Ashmont).\n\nRead more at https://www.mbta.com/news/2024-06-18/ju
 ly-service-changes-mbta-continues-repair-work-improve-reliability-across-t
 he
NAME:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Ashmont)
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Braintree)
DTSTART;VALUE=DATE:20240819
DTEND;VALUE=DATE:20240827
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Kendall/MIT and JF
 K/UMass (Braintree).\n\nRead more at https://www.mbta.com/news/2024-07-17/
 august-service-changes-mbta-continues-repair-work-improve-reliability-acro
 ss-the
NAME:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Braintree)
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20240906
DTEND;VALUE=DATE:20240930
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nRead more at https://www.mbta.com/news/2024-07-18/ma
 jor-red-line-braintree-branch-improvement-work-take-place-september-6-29-m
 bta
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Ashmont) - Ashmont
DTSTART;VALUE=DATE:20240928
DTEND;VALUE=DATE:20240930
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Ashmont
 ) and Ashmont.\n\nRead more at https://www.mbta.com/news/2024-09-25/red-li
 ne-service-suspension-expanded-include-ashmont-branch-saturday-only-septem
 ber
NAME:MBTA Red Line Shutdown | JFK/UMass (Ashmont) - Ashmont
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - North Quincy
DTSTART;VALUE=DATE:20241105
DTEND;VALUE=DATE:20241111
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and North
  Quincy.\n\nRead more at https://www.mbta.com/news/2024-10-17/november-ser
 vice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Broadway - North Quincy
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - Ashmont
DTSTART;VALUE=DATE:20241109
DTEND;VALUE=DATE:20241111
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and Ashmo
 nt.\n\nRead more at https://www.mbta.com/news/2024-10-17/november-service-
 changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Broadway - Ashmont
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Harvard - Broadway
DTSTART;VALUE=DATE:20241118
DTEND;VALUE=DATE:20241125
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Harvard and Broadw
 ay.\n\nRead more at https://www.mbta.com/news/2024-10-17/november-service-
 changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Red Line Shutdown | Harvard - Broadway
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250125
DTEND;VALUE=DATE:20250127
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nReason: Signal upgrades\n\nRead more at https://www.
 mbta.com/news/2024-12-26/mbta-announces-january-service-changes
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250208
DTEND;VALUE=DATE:20250210
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nReason: Signal upgrades\n\nRead more at https://www.
 mbta.com/news/2025-01-22/mbta-announces-february-service-changes
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250222
DTEND;VALUE=DATE:20250224
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nReason: Signal upgrades\n\nRead more at https://www.
 mbta.com/news/2025-01-22/mbta-announces-february-service-changes
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250308
DTEND;VALUE=DATE:20250310
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nReason: Signal upgrades\n\nRead more at https://www.
 mbta.com/news/2025-02-21/mbta-announces-march-service-changes
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250322
DTEND;VALUE=DATE:20250324
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nReason: Signal upgrades\n\nRead more at https://www.
 mbta.com/news/2025-02-21/mbta-announces-march-service-changes
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250329
DTEND;VALUE=DATE:20250331
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nReason: Signal upgrades\n\nRead more at https://www.
 mbta.com/news/2025-02-21/mbta-announces-march-service-changes
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Ashmont) - Ashmont
DTSTART;VALUE=DATE:20250401
DTEND;VALUE=DATE:20250410
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Ashmont
 ) and Ashmont.\n\nReason: Proactive rail maintenance\n\nRead more at https
 ://www.mbta.com/news/2025-01-17/mbta-shares-planned-service-outage-schedul
 ed-january-june-2025
NAME:MBTA Red Line Shutdown | JFK/UMass (Ashmont) - Ashmont
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Ashmont) - Ashmont
DTSTART;VALUE=DATE:20250429
DTEND;VALUE=DATE:20250501
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Ashmont
 ) and Ashmont.\n\nRead more at https://www.mbta.com/projects/2025-planned-
 closures
NAME:MBTA Red Line Shutdown | JFK/UMass (Ashmont) - Ashmont
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250503
DTEND;VALUE=DATE:20250505
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nRead more at https://www.mbta.com/projects/2025-plan
 ned-closures
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250531
DTEND;VALUE=DATE:20250602
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nRead more at https://www.mbta.com/projects/2025-plan
 ned-closures
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
DTSTART;VALUE=DATE:20250614
DTEND;VALUE=DATE:20250616
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between JFK/UMass (Braintr
 ee) and Braintree.\n\nRead more at https://www.mbta.com/projects/2025-plan
 ned-closures
NAME:MBTA Red Line Shutdown | JFK/UMass (Braintree) - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Ashmont)
DTSTART;VALUE=DATE:20250710
DTEND;VALUE=DATE:20250714
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Kendall/MIT and JF
 K/UMass (Ashmont).\n\nReason: Signal upgrades\, regular maintenance\n\nRea
 d more at https://www.mbta.com/projects/2025-planned-closures
NAME:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Ashmont)
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Ashmont)
DTSTART;VALUE=DATE:20250717
DTEND;VALUE=DATE:20250721
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Kendall/MIT and JF
 K/UMass (Ashmont).\n\nReason: Signal upgrades\, regular maintenance\n\nRea
 d more at https://www.mbta.com/projects/2025-planned-closures
NAME:MBTA Red Line Shutdown | Kendall/MIT - JFK/UMass (Ashmont)
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | North Quincy - Braintree
DTSTART;VALUE=DATE:20250802
DTEND;VALUE=DATE:20250811
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between North Quincy and B
 raintree.\n\nRead more at https://www.mbta.com/projects/2025-planned-closu
 res
NAME:MBTA Red Line Shutdown | North Quincy - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | North Quincy - Braintree
DTSTART;VALUE=DATE:20251115
DTEND;VALUE=DATE:20251124
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between North Quincy and B
 raintree.\n\nReason: Regular maintenance\n\nRead more at https://www.mbta.
 com/news/2025-10-20/mbta-announces-november-service-changes
NAME:MBTA Red Line Shutdown | North Quincy - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | North Quincy - Braintree
DTSTART;VALUE=DATE:20251122
DTEND;VALUE=DATE:20251124
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between North Quincy and B
 raintree.\n\nRead more at https://www.mbta.com/projects/2025-planned-closu
 res
NAME:MBTA Red Line Shutdown | North Quincy - Braintree
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Red Line Shutdown | Broadway - Ashmont
DTSTART;VALUE=DATE:20260221
DTEND;VALUE=DATE:20260223
COLOR:red
DESCRIPTION:The MBTA Red Line will be shut down between Broadway and Ashmo
 nt.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Red Line Shutdown | Broadway - Ashmont
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Forest Hills - Ruggles
DTSTART;VALUE=DATE:20240217
DTEND;VALUE=DATE:20240219
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Forest Hills an
 d Ruggles.\n\nRead more at https://www.mbta.com/news/2024-01-19/february-s
 ervice-changes-update-mbta-continue-repair-work-improve-and-deliver-more
NAME:MBTA Orange Line Shutdown | Forest Hills - Ruggles
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Forest Hills - Ruggles
DTSTART;VALUE=DATE:20240309
DTEND;VALUE=DATE:20240311
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Forest Hills an
 d Ruggles.\n\nRead more at https://www.mbta.com/news/2024-02-23/march-serv
 ice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Forest Hills - Ruggles
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Jackson Square - North Station
DTSTART;VALUE=DATE:20240318
DTEND;VALUE=DATE:20240322
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Jackson Square 
 and North Station.\n\nRead more at https://www.mbta.com/news/2024-02-23/ma
 rch-service-changes-mbta-continues-repair-work-improve-reliability-across-
 the
NAME:MBTA Orange Line Shutdown | Jackson Square - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Forest Hills - Ruggles
DTSTART;VALUE=DATE:20240330
DTEND;VALUE=DATE:20240401
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Forest Hills an
 d Ruggles.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-serv
 ice-changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Orange Line Shutdown | Forest Hills - Ruggles
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Forest Hills - Ruggles
DTSTART;VALUE=DATE:20240406
DTEND;VALUE=DATE:20240408
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Forest Hills an
 d Ruggles.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-serv
 ice-changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Orange Line Shutdown | Forest Hills - Ruggles
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Forest Hills - Ruggles
DTSTART;VALUE=DATE:20240420
DTEND;VALUE=DATE:20240422
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Forest Hills an
 d Ruggles.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-serv
 ice-changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Orange Line Shutdown | Forest Hills - Ruggles
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Forest Hills - Ruggles
DTSTART;VALUE=DATE:20240427
DTEND;VALUE=DATE:20240429
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Forest Hills an
 d Ruggles.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-serv
 ice-changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Orange Line Shutdown | Forest Hills - Ruggles
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20240517
DTEND;VALUE=DATE:20240520
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-an
 nounces-ambitious-track-improvement-program-eliminate-all-speed-restrictio
 ns
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - Back Bay
DTSTART;VALUE=DATE:20240528
DTEND;VALUE=DATE:20240607
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 Back Bay.\n\nRead more at https://www.mbta.com/news/2024-05-20/june-servic
 e-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Wellington - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20240607
DTEND;VALUE=DATE:20240610
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nRead more at https://www.mbta.com/news/2024-05-20/june-se
 rvice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20240622
DTEND;VALUE=DATE:20240624
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nRead more at https://www.mbta.com/news/2024-05-20/june-se
 rvice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - North Station
DTSTART;VALUE=DATE:20240622
DTEND;VALUE=DATE:20240701
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 North Station.\n\nRead more at https://www.mbta.com/news/2024-05-20/june-s
 ervice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Wellington - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - Back Bay
DTSTART;VALUE=DATE:20240803
DTEND;VALUE=DATE:20240805
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 Back Bay.\n\nRead more at https://www.mbta.com/news/2024-07-17/august-serv
 ice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Wellington - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Back Bay - Forest Hills
DTSTART;VALUE=DATE:20240810
DTEND;VALUE=DATE:20240812
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Back Bay and Fo
 rest Hills.\n\nRead more at https://www.mbta.com/news/2024-07-17/august-se
 rvice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Back Bay - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - Back Bay
DTSTART;VALUE=DATE:20240817
DTEND;VALUE=DATE:20240819
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 Back Bay.\n\nRead more at https://www.mbta.com/news/2024-07-17/august-serv
 ice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Wellington - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Back Bay - Forest Hills
DTSTART;VALUE=DATE:20241008
DTEND;VALUE=DATE:20241012
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Back Bay and Fo
 rest Hills.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-anno
 unces-ambitious-track-improvement-program-eliminate-all-speed-restrictions
NAME:MBTA Orange Line Shutdown | Back Bay - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20241012
DTEND;VALUE=DATE:20241015
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta
 -announces-ambitious-track-improvement-program-eliminate-all-speed-restric
 tions
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20241012
DTEND;VALUE=DATE:20241015
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta
 -announces-ambitious-track-improvement-program-eliminate-all-speed-restric
 tions
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Back Bay - Forest Hills
DTSTART;VALUE=DATE:20241015
DTEND;VALUE=DATE:20241021
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Back Bay and Fo
 rest Hills.\n\nRead more at https://www.mbta.com/news/2023-11-09/mbta-anno
 unces-ambitious-track-improvement-program-eliminate-all-speed-restrictions
NAME:MBTA Orange Line Shutdown | Back Bay - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - Ruggles
DTSTART;VALUE=DATE:20241026
DTEND;VALUE=DATE:20241028
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and R
 uggles.\n\nRead more at https://www.mbta.com/news/2024-10-17/november-serv
 ice-changes-mbta-continues-repair-work-improve-reliability-across-the
NAME:MBTA Orange Line Shutdown | Oak Grove - Ruggles
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20241026
DTEND;VALUE=DATE:20241102
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nRead more at https://www.mbta.com/news/2024-10-17/novembe
 r-service-changes-mbta-continues-repair-work-improve-reliability-across-th
 e
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20250117
DTEND;VALUE=DATE:20250121
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nReason: Support Maffa Way/Mystic Avenue Bridge replacemen
 t\n\nRead more at https://www.mbta.com/news/2024-12-26/mbta-announces-janu
 ary-service-changes
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20250131
DTEND;VALUE=DATE:20250203
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nReason: Support Maffa Way/Mystic Avenue Bridge replacemen
 t\n\nRead more at https://www.mbta.com/news/2024-12-26/mbta-announces-janu
 ary-service-changes
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20250214
DTEND;VALUE=DATE:20250218
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nReason: Support Maffa Way/Mystic Avenue Bridge replacemen
 t\n\nRead more at https://www.mbta.com/news/2025-01-22/mbta-announces-febr
 uary-service-changes
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Jackson Square
DTSTART;VALUE=DATE:20250301
DTEND;VALUE=DATE:20250303
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Jackson Square.\n\nReason: Signal upgrades\n\nRead more at https://www.
 mbta.com/news/2025-02-21/mbta-announces-march-service-changes
NAME:MBTA Orange Line Shutdown | North Station - Jackson Square
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20250307
DTEND;VALUE=DATE:20250310
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nReason: Support Maffa Way/Mystic Avenue Bridge replacemen
 t\n\nRead more at https://www.mbta.com/news/2025-01-22/mbta-announces-febr
 uary-service-changes
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Oak Grove - North Station
DTSTART;VALUE=DATE:20250509
DTEND;VALUE=DATE:20250519
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Oak Grove and N
 orth Station.\n\nReason: Support Maffa Way/Mystic Avenue Bridge replacemen
 t\n\nRead more at https://www.mbta.com/news/2025-01-17/mbta-shares-planned
 -service-outage-scheduled-january-june-2025
NAME:MBTA Orange Line Shutdown | Oak Grove - North Station
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20250530
DTEND;VALUE=DATE:20250602
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nRead more at https://www.mbta.com/projects/2025-planne
 d-closures
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20250621
DTEND;VALUE=DATE:20250623
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nReason: Signal upgrades\n\nRead more at https://www.mb
 ta.com/news/2025-01-17/mbta-shares-planned-service-outage-scheduled-januar
 y-june-2025
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Back Bay - Forest Hills
DTSTART;VALUE=DATE:20250623
DTEND;VALUE=DATE:20250628
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Back Bay and Fo
 rest Hills.\n\nReason: Support Maffa Way/Mystic Avenue Bridge replacement\
 , signal upgrades\n\nRead more at https://www.mbta.com/projects/2025-plann
 ed-closures
NAME:MBTA Orange Line Shutdown | Back Bay - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20250628
DTEND;VALUE=DATE:20250630
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nReason: Signal upgrades\n\nRead more at https://www.mb
 ta.com/news/2025-01-17/mbta-shares-planned-service-outage-scheduled-januar
 y-june-2025
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - Back Bay
DTSTART;VALUE=DATE:20250726
DTEND;VALUE=DATE:20250728
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 Back Bay.\n\nRead more at https://www.mbta.com/projects/2025-planned-closu
 res
NAME:MBTA Orange Line Shutdown | Wellington - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - Back Bay
DTSTART;VALUE=DATE:20250802
DTEND;VALUE=DATE:20250804
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 Back Bay.\n\nRead more at https://www.mbta.com/projects/2025-planned-closu
 res
NAME:MBTA Orange Line Shutdown | Wellington - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - Back Bay
DTSTART;VALUE=DATE:20250809
DTEND;VALUE=DATE:20250811
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 Back Bay.\n\nRead more at https://www.mbta.com/projects/2025-planned-closu
 res
NAME:MBTA Orange Line Shutdown | Wellington - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - Back Bay
DTSTART;VALUE=DATE:20250823
DTEND;VALUE=DATE:20250825
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 Back Bay.\n\nRead more at https://www.mbta.com/projects/2025-planned-closu
 res
NAME:MBTA Orange Line Shutdown | Wellington - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20250913
DTEND;VALUE=DATE:20250915
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nRead more at https://www.mbta.com/projects/2025-planne
 d-closures
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Jackson Sq - Jackson Sq
DTSTART;VALUE=DATE:20250920
DTEND;VALUE=DATE:20250922
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Jackson Sq and 
 Jackson Sq.\n\nRead more at https://www.mbta.com/projects/2025-planned-clo
 sures
NAME:MBTA Orange Line Shutdown | Jackson Sq - Jackson Sq
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20250927
DTEND;VALUE=DATE:20250929
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nRead more at https://www.mbta.com/projects/2025-planne
 d-closures
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20251011
DTEND;VALUE=DATE:20251014
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nRead more at https://www.mbta.com/projects/2025-planne
 d-closures
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | North Station - Forest Hills
DTSTART;VALUE=DATE:20251101
DTEND;VALUE=DATE:20251103
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between North Station a
 nd Forest Hills.\n\nReason: Signal upgrades\n\nRead more at https://www.mb
 ta.com/news/2025-10-20/mbta-announces-november-service-changes
NAME:MBTA Orange Line Shutdown | North Station - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Back Bay - Forest Hills
DTSTART;VALUE=DATE:20251114
DTEND;VALUE=DATE:20251117
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Back Bay and Fo
 rest Hills.\n\nReason: Starting at 8:30pm on November 14\, Signal upgrades
 \n\nRead more at https://www.mbta.com/news/2025-10-20/mbta-announces-novem
 ber-service-changes
NAME:MBTA Orange Line Shutdown | Back Bay - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Back Bay - Forest Hills
DTSTART;VALUE=DATE:20251205
DTEND;VALUE=DATE:20251207
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Back Bay and Fo
 rest Hills.\n\nRead more at https://www.mbta.com/projects/2025-planned-clo
 sures
NAME:MBTA Orange Line Shutdown | Back Bay - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Wellington - Back Bay
DTSTART;VALUE=DATE:20260110
DTEND;VALUE=DATE:20260112
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Wellington and 
 Back Bay.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Orange Line Shutdown | Wellington - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Jackson Square - Forest Hills
DTSTART;VALUE=DATE:20260214
DTEND;VALUE=DATE:20260217
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Jackson Square 
 and Forest Hills.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Orange Line Shutdown | Jackson Square - Forest Hills
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Orange Line Shutdown | Forest Hills - Back Bay
DTSTART;VALUE=DATE:20260228
DTEND;VALUE=DATE:20260309
COLOR:orange
DESCRIPTION:The MBTA Orange Line will be shut down between Forest Hills an
 d Back Bay.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Orange Line Shutdown | Forest Hills - Back Bay
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Bowdoin - Orient Heights
DTSTART;VALUE=DATE:20240409
DTEND;VALUE=DATE:20240412
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Bowdoin and Orien
 t Heights.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-serv
 ice-changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Blue Line Shutdown | Bowdoin - Orient Heights
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Maverick - Wonderland
DTSTART;VALUE=DATE:20240417
DTEND;VALUE=DATE:20240420
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Maverick and Wond
 erland.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-service
 -changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Blue Line Shutdown | Maverick - Wonderland
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Airport - Wonderland
DTSTART;VALUE=DATE:20240420
DTEND;VALUE=DATE:20240501
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Airport and Wonde
 rland.\n\nRead more at https://www.mbta.com/news/2024-03-15/april-service-
 changes-mbta-continues-work-improve-reliability-across-the-system
NAME:MBTA Blue Line Shutdown | Airport - Wonderland
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Bowdoin - Government Center
DTSTART;VALUE=DATE:20250307
DTEND;VALUE=DATE:20250311
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Bowdoin and Gover
 nment Center.\n\nReason: Critical infrastructure upgrades\n\nRead more at 
 https://www.mbta.com/news/2025-02-21/mbta-announces-march-service-changes
NAME:MBTA Blue Line Shutdown | Bowdoin - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Bowdoin - Government Center
DTSTART;VALUE=DATE:20250321
DTEND;VALUE=DATE:20250325
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Bowdoin and Gover
 nment Center.\n\nReason: Critical infrastructure upgrades\n\nRead more at 
 https://www.mbta.com/news/2025-02-21/mbta-announces-march-service-changes
NAME:MBTA Blue Line Shutdown | Bowdoin - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Bowdoin - Government Center
DTSTART;VALUE=DATE:20250411
DTEND;VALUE=DATE:20250415
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Bowdoin and Gover
 nment Center.\n\nRead more at https://www.mbta.com/projects/2025-planned-c
 losures
NAME:MBTA Blue Line Shutdown | Bowdoin - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Bowdoin - Government Center
DTSTART;VALUE=DATE:20250425
DTEND;VALUE=DATE:20250429
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Bowdoin and Gover
 nment Center.\n\nRead more at https://www.mbta.com/projects/2025-planned-c
 losures
NAME:MBTA Blue Line Shutdown | Bowdoin - Government Center
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Bowdoin - Orient Heights
DTSTART;VALUE=DATE:20250607
DTEND;VALUE=DATE:20250616
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Bowdoin and Orien
 t Heights.\n\nRead more at https://www.mbta.com/projects/2025-planned-clos
 ures
NAME:MBTA Blue Line Shutdown | Bowdoin - Orient Heights
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Airport - Wonderland
DTSTART;VALUE=DATE:20250809
DTEND;VALUE=DATE:20250818
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Airport and Wonde
 rland.\n\nReason: Regular maintenance\n\nRead more at https://www.mbta.com
 /projects/2025-planned-closures
NAME:MBTA Blue Line Shutdown | Airport - Wonderland
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Bowdoin - Airport
DTSTART;VALUE=DATE:20250919
DTEND;VALUE=DATE:20250922
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Bowdoin and Airpo
 rt.\n\nRead more at https://www.mbta.com/projects/2025-planned-closures
NAME:MBTA Blue Line Shutdown | Bowdoin - Airport
END:VEVENT
BEGIN:VEVENT
SUMMARY:MBTA Blue Line Shutdown | Bowdoin - Airport
DTSTART;VALUE=DATE:20260124
DTEND;VALUE=DATE:20260126
COLOR:blue
DESCRIPTION:The MBTA Blue Line will be shut down between Bowdoin and Airpo
 rt.\n\nRead more at https://www.mbta.com/alerts
NAME:MBTA Blue Line Shutdown | Bowdoin - Airport
END:VEVENT
END:VCALENDAR